Skyscrapers

Hilton Plaza, Warsaw, Poland For construction of the structurally braced reinforced concrete core as well as internal and external walls, the variable VARIO GT 24 girder wall formwork mounted on KGF 240 climbing scaffold was used. In the outer areas, however, the climbing ...
Falcon Wharf Project, London, United Kingdom PERI’s new RCS P (Rail Climbing System - Protection) has been a success on the 18 storey Falcon Wharf Project on the River Thames at Wandsworth.
Hyatt Hotel Convention Center, Denver, CO, USA Along with the QUATTRO VARIO column formwork system, J.A. Walker Company was able to form various column dimensions using only one system.
Broadway 655, San Diego, CA, USA Broadway 655 is the first office tower built in downtown San Diego in 12 years.
The Lancaster, Chicago, IL, USA The Lancaster is another highrise being built in the Lake Shore development area in Chicago, IL.
Google +
LinkedIn
Twitter