Specialist concrete frame subcontractors, Byrne Brothers used PERI’s VARIO girder wall formwork system to create the highquality, architectural finish required for the first two storeys of the building’s ‘C’-shaped central core.
This new development is London’s largest mixed-use affordable scheme presently under construction and is a test of engineering skills and logistical planning.
In order to produce the level of finish required for this building, Elite Formwork Inc. used the KG Climbing Bracket along with an extension for the finishing platform. Using this system allowed the contractor to perform the required finish ...
Elite Formwork Inc. decided to use the PERI UNIPORTAL table system. By using this system, tables ranging in size from 16 ft x 26 ft (4.80 m x 8.00 m) were effectively flown by using the self leveling C-Hook.