Skyscrapers

Exhibition Centre Hotel Rho-Pero, Milan, Italy The new exhibition centre hotel with its two inclined towers dominates the extensive Milan trade fair facilities. In order to be able to efficiently finish the concrete shell in the specified, short construction period of only twelve months ...
The Elektron Buildings, London E14 The steel frames for the RCS P panels were pre-assembled at the PERI depot in Rugby and shipped to site where they were completed with timber struts and faced with plywood.
RBC Centre, Toronto, Ontario The project also features an adjoining 10 story podium structure, which has a typical office floor plate of 37,000 ft² (3,437 m²) and 3 levels of underground parking.
Concord City Place, Block 24 LM, Toronto, Ontario The PERI RCS Rail Climbing Protection Panel was used on the Block 24 tower at Toronto’s Concord City Place.
44 Monroe, Phoenix, Arizona PERI supplied 7,200 ft² (669 m²) of UNIPORTAL tableforms and 8,200 ft² (762 m²) of SKYDECK for the typical floors.

Google +
LinkedIn
Twitter