The construction of this 590 m long cable-stayed bridge is characterized by two 100 m high, A-shaped pylons – construction execution with high levels of safety and cost-effectiveness provided by PERI know-how and system equipment. ACS self-climbing ...
During the formwork planning, PERI engineers also had to take into account 2 m high arched beams in the area of the piers which then required the position of the launching beam to be lowered by the same amount.
Basis of the PERI solution was the skilful combination of VARIO standard elements with made-to-measure filler elements which was carried out using rentable standard components.