Power Stations

PERI GmbH - Refuse Derived Heating and Power Station, Spreerecycling GmbH & Co. KG, Spremberg, Germany PERI GmbH - Refuse Derived Heating and Power Station, Spreerecycling GmbH & Co. KG, Spremberg, Germany PERI GmbH - Refuse Derived Heating and Power Station, Spreerecycling GmbH & Co. KG, Spremberg, Germany More Images  

Refuse Derived Heating and Power Station, Spreerecycling GmbH & Co. KG, Spremberg, Germany


Formwork, Scaffolding and Engineering for huge power plant construction



The Glass Ingenieurbau Leipzig GmbH construction team have to deal with a tight schedule with just 18 months available to complete the skeleton work for the over 50 m high power station complex.

System-realised heavy shoring
Four VARIOKIT heavy-duty shoring towers temporarily support the cantilevered components. With an individual leg supporting height of 23.60 m, each legs of the falsework carries loads of 560 kN – this means that a single tower supports more than 200 tonnes. Assembly of the heavy duty towers is carried out easily and safely horizontally on the ground using two 10 m sections which are supplemented with the corresponding base and head units. Combining the units with the PERI UP Rosett Flex modular scaffold system allowed the formation of safe working platforms in the head area. These had been fixed to the shoring when it was positioned horizontally on the ground and then erected together with the tower unit.

Flexible and versatile scaffolding
In addition, the PERI UP scaffolding system provides the basis for all access means as well as the shoring and reinforcement scaffold on the jobsite. The Glass site personnel mount the scaffold units and continually adapt these to match the construction progress. 75 cm wide, easy to handle stair elements are used in order to realise the up to 60 m high access points. The permissible load of the high strength aluminium flights of stairs is 2.0 kN/m². With system components of the flexible PERI UP Rosett Flex scaffold, the walkways and landing junctions are also realised.

PERI UP is being used by the Glass team as type tested shoring for supporting heights of up to 20 m. The metric grid dimensions ensure here a maximum degree of adaptation of the load-bearing system to the actual loads. In addition, PERI UP also serves as reinforcement scaffold. The units are up to 10 m high and can be transported as 60 m² moveable units with the crane to the next construction phase without requiring any time-consuming modification work.

Climbing on a large scale
The CB 240 climbing scaffold system and VARIO GT 24 girder wall formwork form crane moveable climbing formwork units for constructing the massive walls of the building with concreting cycle heights of 4 m. The formwork concept that has been developed requires in particular adapting different climbing cycles to suit the complicated geometry: the walls have haunched corners and taper upwards from 1.40 m to 0.30 m. The PERI solution takes into consideration all climbing cycles whereby adjusting to a 10 cm wall thickness difference each time is required.

PERI Systems In Use
  • PERI UP Rosett Shoring Tower
  • Heavy-Duty Shoring Tower
  • PERI UP Stair Tower 75
  • VARIO GT 24 Girder Wall Formwork
  • PERI UP Scaffold Units
  • CB Climbing System
  • Contractor: Glass Ingenieurbau Leipzig GmbH
    Field Service: PERI GmbH, Deutschland
    PERI Press Release 09/2011
     