In the course of the expansion of Route Nationale 88, an 80 m long wild game underpass is also being realised. For construction of the arched tunnel, a PERI tunnel formwork carriage on the basis of the VARIOKIT engineering construction kit ...
|
|
The Waldschloesschen Bridge spans the Elbe River with a shallow, elegant arch. PERI has planned and is supplying the formwork for the superstructure of the steel composite bridge, and won over the construction site team with an easy-to-use ...
|
|
The irregular-positioned cantilevered, massive reinforced concrete balconies of the Milan office and residential building "Il Bosco Verticale" are planted with numerous trees and shrubs. With the help of the PERI formwork and scaffolding solution, ...
|
|
European Football Championship 2012 kick-off: Spread over four storeys – in the centre of the Ukranian capital – 250,000 m² of usable space will be available when the project is completed. PERI has supported the construction site management ...
|
|
For the 2.2 km long Danube bridge, Serbian and German PERI engineers, together with the Alpine project team, developed a customised formwork solution using the VARIOKIT parapet carriage. With four parallel operating units six casting segments, ...
|